24 modules. Zero add-ons.

Built specifically for public works REs and CMs. DOT form libraries for all 50 states, AI throughout, offline-capable, zero training required.

AI-Powered Daily Reports

CEM-4501

The heart of the system. Create professional CEM-4501 daily reports in minutes, not hours. Voice-to-text, AI narratives, auto-weather, and GPS photo tagging.

  • Voice-to-text field notes structured by AI
  • Professional narratives auto-generated from work items
  • Photo capture with GPS tagging and AI classification
  • Auto-fill weather from NWS API by project coordinates
  • Reusable templates and copy-from-previous
  • CEM-4801 quantity calculations linked to bid items
Daily Report #47
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC

Daily Report #47

March 15, 2026 — I-5 Bridge Rehabilitation

Submitted
Sunny, 72°FWind: 5 mph NWHumidity: 45%
AUTO-FILLED

Work Items

201(A)Placed 45 CY structural concrete — Bent 3 columns45 CY
51(B)Installed 12 tons rebar — deck mat bottom layer12 TN
10(D)Mobilized crane for girder placement — Stage 21 LS
AI-Generated Narrative

Construction continued on the I-5 Bridge Rehabilitation project under favorable weather conditions. The crew placed 45 cubic yards of structural concrete at Bent 3 columns, completing the pour by 14:30. Rebar installation for the deck bottom mat progressed with 12 tons placed. Crane mobilization for Stage 2 girder placement was completed and ready for operations scheduled March 16.

6 Photos 37.7749, -122.4194 Voice note transcribed

Pay Applications

CEM-6101

From bid item import to monthly progress pay estimates. Quantities flow automatically from daily reports to payment.

  • Import bid schedule from CSV/Excel
  • Daily quantities auto-aggregate to monthly summaries
  • Progress pay estimate (CEM-6101) auto-generated
  • Materials on hand tracking (CEM-5105)
  • Retainage auto-calculation (5% to 0% at 50%)
Budget & Pay Estimates
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC

$14.2M

Total Contract

$8.7M

Earned to Date

$5.5M

Remaining

61%

% Complete

Overall Progress61%

Top Bid Items — Earned vs Remaining

Document Control

Submittals, RFIs, CCOs

Every document tracked, classified, and searchable. Approval workflows with e-signatures and SLA timers.

  • OCR and AI auto-classification for uploads
  • Ball-in-Court tracking with SLA countdown timers
  • Change order tracking (CEM-4900 series)
  • E-signatures for approvals — no printing required
  • Version history with text diff comparison
  • Email notifications on status changes
Document Control
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC

Document Control

AllSubmittalsRFIsCCOs
Submittal #28Structural Steel Shop Drawings — Rev 2
Pending Review
J. Williams (RE) 2 days left
RFI #14Traffic Control Plan — Stage 3 Revision
Open
Contractor 5 days left
Submittal #31Concrete Mix Design — Precast Girders
Approved
Closed Complete
CCO #5Changed Conditions — Retaining Wall
Under Review
District Office 1 day overdue

Force Account Automation

CEM-4902

The biggest time saver in the platform. Auto-generate Extra Work Bills daily from your daily reports. Save 4-6 hours per week.

  • Labor charges (CEM-4902B) with prevailing wage rates
  • Equipment charges (CEM-4902C) — Caltrans rates built in
  • Material charges (CEM-4902D) with vendor tracking
  • Extra Work Bills auto-generated from daily entries
  • CEM-4907 e-signature for contractor sign-off
  • CCO threshold alerts ($200K/$500K HQ review)
Force Account — CCO #5
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC

Extra Work Bill — CCO #5

March 15, 2026 — Retaining Wall Foundation

Auto-generated from daily report
WorkerClassificationST HrsOT HrsRateTotal
J. MartinezIronworker82$78.50$863.50
R. ChenCement Mason80$72.00$576.00
M. DavisOperating Engr81.5$85.00$871.25

Labor

$2,310.75

Equipment

$2,150.00

Materials

$890.40

Day Total

$7,320.15

Labor Compliance Engine

CEM-2502 / DIR eCPR

Track every payroll, flag every violation, generate DIR-ready XML. Compliance on autopilot.

  • Certified payroll tracking for every contractor/sub
  • Auto-alerts for late or missing payroll submissions
  • CEM-2513 field count vs. payroll cross-reference
  • DIR prevailing wage rate lookup — auto-updated
  • DIR eCPR XML generation for direct upload
  • CEM-2506 wage violation forms auto-generated
Labor Compliance
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC

Labor Compliance

2 compliant2 issues
ContractorPayrollWorkersField CountStatus

Pacific Steel Inc.

Prime

Received1212

Bay Area Concrete

Sub

Late (3d)810

Golden Gate Paving

Sub

Received66 Wage Issue

Sierra Electrical

Sub

Missing04
Week ending Mar 14, 2026CEM-2513 field counts entered ✓DIR eCPR XML ready for 2 contractors

Claims Defense AI

Semantic Search & Narrative Generation

When claims happen, Struxcor builds your case. AI searches all documentation and generates court-ready narratives with cited evidence.

  • Semantic search across all project documents
  • AI generates narratives with cited evidence chains
  • Timeline reconstruction from daily report data
  • Documentation gap analysis and alerts
  • Export claims package as organized PDF binder
Claims Defense AI
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC
weather delays affecting Bent 3 schedule
AI Analysis

Found 14 documents across 23 days related to weather delays at Bent 3. Documentation shows a clear chain: initial rain delay (DR #42, Feb 28) → groundwater discovery → RFI #7 requesting drainage redesign �� CCO #3 for changed conditions. Total documented impact: 8 working days + $47,500 in additional costs.

Top Evidence — 3 of 14 documents

Daily Report #42Feb 28, 2026
HIGH

Rain delay — all concrete operations suspended. Standing water in Bent 3 excavation...

RFI #7Mar 3, 2026
HIGH

Request for revised drainage plan due to unforeseen groundwater at Bent 3 location...

CCO #3Mar 8, 2026
MED

Changed conditions — additional dewatering required. Contractor claims 5 working days...

Offline Mobile PWA

Works Without Internet

Built for the field where cell service doesn't reach. Full functionality offline, auto-sync when connected.

  • Complete daily report entry with no internet
  • Photo capture with GPS tagging and timestamps
  • Voice recording for field notes
  • Auto-sync queue — zero data loss
  • Install on any phone, no app store required
9:41
SC
Daily Report
Offline

Date

March 15, 2026

Sunny, 72°F

Auto-detected from GPS

Work Description

Placed 45 CY concrete at Bent 3...

2 reports queued — will sync when online

Real-Time Dashboards

Project Intelligence

Know the health of every project at a glance. Budget tracking, schedule adherence, compliance status — all updated in real time.

  • Project health score (0-100) with breakdown
  • Budget vs. actual with forecast charts
  • Working days tracking (CEM-2701)
  • Labor compliance status across all contractors
  • Multi-project portfolio view for PMs
Project Dashboard
SC
Overview
Reports
Pay
Docs
Force Acct
Labor
Punch
QA/QC
Daily Reports

142

3 drafts

Open Items

16

4 overdue

Working Days

87/145

60% used

Budget

$8.7M

of $14.2M

Project Health

87
Documentation88%
Compliance90%
Budget83%

Open Items

4 overdue
RFI#12Foundation rebar spacing clarification
3d overdue
Submittal#28Structural steel shop drawings — Rev 2
CCO#5Additional retaining wall — changed conditions
7d overdue
RFI#14Traffic control plan update for Stage 3
1d overdue

Plus 15 more built-in modules

Every tool a construction team needs — no add-ons, no plugins, no extra cost.

Drawings & Plan Sheets

Upload PDFs, annotate with pins, revision tracking

Schedule & Gantt Charts

CPM scheduling, task dependencies, milestone tracking

Photo Gallery

GPS-tagged photos organized by daily report and date

Inspections

General, sub-inspection, third-party, pre-pour, and pre-pave logs

Safety & Incidents

OSHA tracking, corrective actions, severity classification

SWPPP / Stormwater

BMP inspections, rain events, compliance tracking

Punch Lists

Create, assign, track, verify, and close punch items

QC Testing

Test logs, lab results, pass/fail tracking by specification

Time Cards

Daily hours entry, approval workflows, admin/RE sign-off

Equipment Registry

Fleet tracking, rental rates, inspection due dates

Meeting Minutes

Agendas, attendees, action items with status tracking

Correspondence Log

Letters, transmittals, RFIs — response tracking with due dates

Bid Management

Bid packages, contractor responses, tabulation and award

DBE Goal Tracking

DBE commitments, utilization %, firm-level tracking

Integrations

Outlook, Google Calendar, OneDrive, Dropbox, REST API, iCal feeds

Every State DOT Form, Built In

Struxcor supports DOT form libraries for all 50 states. Select your state and the right forms auto-populate — Caltrans CEM, TxDOT, FDOT, NYSDOT, PennDOT, and more.

50-State DOT Form Library

Select your state to see applicable DOT forms

CaltransCalifornia Department of Transportation50 forms

Daily Reports

CEM-4501

Daily Report

Resident Engineer daily inspection report with weather, work items, and AI narratives

Quantities & Pay

CEM-4801

Quantity Calculations

Bid item quantity computations linked to daily reports

CEM-6101

Progress Pay Estimate

Monthly pay estimates auto-generated from daily quantities

CEM-5105

Materials on Hand

Track stockpiled materials with pay deduction calculations

Change Orders

CEM-4900

Change Order Series

CCO tracking with HQ threshold alerts ($200K/$500K)

Force Account

CEM-4902

Extra Work Bill

Force account labor, equipment, and material charges

CEM-4902B

Labor Charges

Prevailing wage labor costs with fringe benefits

CEM-4902C

Equipment Charges

Caltrans equipment rental rates auto-populated

CEM-4902D

Material Charges

Vendor-tracked material costs for extra work

CEM-4907

Contractor Signature

E-signature for contractor sign-off on extra work

Labor Compliance

CEM-2502

Labor Compliance

Certified payroll tracking and violation monitoring

CEM-2504

Employee Interview

Wage interview and payroll deduction calculations

CEM-2506

Wage Violation

Notice of potential labor code violation with penalties

CEM-2507

Fringe Benefits

Fringe benefit verification and tracking

CEM-2508

Apprentice Compliance

DAS 140/142 apprenticeship ratio tracking

CEM-2513

Field Count

Field worker count vs. certified payroll cross-reference

Time & Schedule

CEM-2701

Working Days

Contract time tracking with weather day adjustments

Certified Payroll

DIR eCPR

Electronic Payroll

Generate XML for direct upload to DIR eCPR portal

Document Control

CEM-RFI

Request for Information

Contractor RFI tracking with SLA timers

CEM-SUB

Submittal

Shop drawing and material submittal review

Testing & QA

CEM-MTL

Material Testing

Source inspection and material test results

Environmental

CEM-SWPPP

Stormwater/SWPPP

SWPPP inspection and BMP compliance

CEM-1801

Environmental Compliance

Environmental compliance monitoring and permit tracking

Project Closeout

CEM-0102

Project Records

Project records index and final documentation checklist

CEM-6301

Final Inspection

Final project inspection and acceptance documentation

Utilities & Coordination

CEM-0601

Utility Verification

Utility relocation verification and coordination log

Traffic Management

CEM-4703

Time Determination

Contract time assessment and traffic delay tracking

As-Built & Records

CEM-1501

Materials Certification

Materials certification and source inspection records

CEM-4601

As-Built Drawings

As-built drawing markups and redline tracking

DBE & Compliance

CEM-1701

DBE Utilization Report

Disadvantaged Business Enterprise utilization and goal tracking

Claims & Disputes

CEM-6401

Claim Documentation

Contractor claim analysis and potential claim tracking

Safety

CEM-0401

Safety Meeting Log

Tailgate safety meeting documentation and attendance

ada_compliance

CEM-5773

ADA Compliance Certification

Project-level ADA compliance certification for permanent pedestrian facilities

CEM-5773ADE

Curb Ramp Case A/D/E

Perpendicular curb ramp ADA inspection (most common)

CEM-5773B

Curb Ramp Case B

Depressed sidewalk curb ramp ADA inspection

CEM-5773C

Curb Ramp Case C

Parallel curb ramp ADA inspection

CEM-5773CH

Curb Ramp Case CH

Combination/hybrid curb ramp ADA inspection

CEM-5773CM

Curb Ramp Case CM

Combination/modified curb ramp ADA inspection

CEM-5773FG

Curb Ramp Case F/G

Retaining curb/flared sides curb ramp ADA inspection

CEM-5773NSPP

Non-Standard Perpendicular

Non-standard perpendicular curb ramp ADA inspection

CEM-5773NSPL

Non-Standard Parallel

Non-standard parallel curb ramp ADA inspection

CEM-5773SW

Sidewalk

Sidewalk ADA compliance inspection

CEM-5773DW

Sidewalk at Driveway

Sidewalk at driveway crossing ADA inspection

CEM-5773P

Parking

Accessible parking space ADA compliance inspection

CEM-5773PW

Passageway

Pedestrian island/passageway (A88B) ADA inspection

CEM-2301

TPAR Initial Inspection

Temporary pedestrian access route initial inspection

CEM-2302

TPAR Weekly Inspection

Temporary pedestrian access route weekly inspection

CEM-2303

TPAR Sidewalk Detour

Temporary sidewalk detour inspection

CEM-2311

TPAR Contractor Compliance

Contractor TPAR compliance certification

CEM-2312

TPAR Contractor Weekly

Contractor weekly TPAR inspection report

All 50 Caltrans forms auto-populate from your project data inside the Struxcor dashboard.

Ready to see it in action?

Start your free trial or book a live demo with our team.